What does it mean?
Which documents are needed depends on the work and the applicable procedure. Have it agreed in advance which existing and new situations, dimensions and substantiations are required.
A drawing for an application is not automatically a complete implementation drawing. Discuss what elaboration is still required after the application and who will provide additions.
What is recorded?
- Situation and project description
- Existing and new condition
- Floor plans, facades and cross-sections as required
- Coordination with the necessary substantiation
Make the assignment concrete
Ask what documents you are receiving, what purpose they are for and what level of detail is provided. Agree on how additions and design changes will be processed and who will coordinate with other parties.
Work with the correct revision
Check that calculations and drawings refer to the same situation. Have important changes assessed first and provide all parties involved with the current documents.