Compare the calculation and the complete implementation.

Split the costs
In addition to calculations and drawings, temporary support, demolition work, steel, assembly and finishing may be required. The chosen solution and accessibility influence the implementation.
Check the same command
A low price may refer to a different package. Determine whether waste disposal, home protection, fire-resistant finishing and repair of floor or ceiling are included.
A breakthrough consists of several possible assignments
The constructive development, temporary support, demolition, steel, assembly and finishing can be done by different parties. The starting price shown for the calculation therefore does not automatically include the complete breakthrough. Ask what construction parts and drawings are included, whether research is needed and how additional work will be handled. In addition, determine with the executor what his assignment contains.
Compare a similar situation
The same opening width does not mean the same constructive assignment. Overhead loads, available supports and the existing foundation may differ. Therefore, compare quotation contents next to the amount. A usable request contains floor plans, desired sizing, photos and known deviations. The clearer this information is, the more targeted the required assessment can be.
Your preparation in four steps
- Calculation and drawing
- Temporary support and implementation
- Steel and mounting
- Finishing and waste disposal
Frequently asked questions on this topic
Can I tell from the thickness whether my wall is load-bearing?
Wall thickness is at most an indication. The load-bearing direction of floors, upper building components, previous renovations and the actual support must be considered together. Collect drawings from multiple floors and determine what additional information is needed. Do not start removal based on a knock test or a comparison with another home.
Is the foundation also examined for a load-bearing wall?
That depends on the agreed assignment and the consequences of the breakthrough. A beam can concentrate forces on smaller support points. The underlying construction and foundation may therefore be relevant. Ask explicitly which supports, columns and existing parts are included, so that it is clear where the assessment ends.
View the associated structural calculation, create your preparation list or take the guides and checklists along to the consultation.
