Compare quotes for a structural engineer

Compare the content and principles of the assignment before comparing amounts.

The short answer

Compare the content and principles of the assignment before comparing amounts.

Construction drawings, measuring tools and laptop on a work table

What exactly is delivered?

A report, an overview drawing and detailed details are different parts. Also check whether a recording, foundation assessment and coordination with suppliers are included in the price.

What changes are included?

A change due to new wishes may be treated differently than a clarification of the original assignment. Ask how revisions and additional questions are handled.

Compare total costs

Check how VAT, research, drawing work and any urgency are handled. Request a clear total or an overview of items that will be calculated separately later.

Make the assignment comparable before comparing totals

Compare per quotation which interventions, existing parts and drawings are included. Note whether investigation, site visit, revisions and additional questions are calculated separately. Then compare amounts with the same VAT treatment. A low price for just a beam calculation is not directly comparable to an assignment that also includes columns, foundations and implementation details. Missing information should appear as a question in your equation.

Ask for clear limits on additional work

A quotation can be based on a certain design version and an agreed amount of tuning. Ask what happens if your plan changes or a missing piece of data requires additional investigation. Don't just consider the hourly rate, but also the decision moment additional work explain. This way you know when you can expect an additional assignment and what information helps to limit that chance.

Make missing appointments visible

PartWhat are you comparing?If you are unsure, ask
SizeSame construction partsWhich parts are outside the assignment?
DeliveryReport, drawings and detailsWhat exactly does the executor receive?
ResearchRecording and additional informationWhen is additional research necessary?
ChangesRevisions and tuningHow is additional work agreed?
PriceSame VAT treatmentWhat is the total including VAT?

Your preparation in four steps

  1. Parts of the report
  2. Drawings and details
  3. Recording and additional research
  4. Revisions and guidance
  5. Total amount and VAT

Frequently asked questions on this topic

What does a structural calculation for a new home include?

A related assignment can concern the foundation, floors, walls, columns, beams and roof. The precise parts and drawings must be agreed. Also ask which supplier calculations are required and who monitors mutual coordination.

When do I involve the structural engineer in new construction?

Preferably during the development of the main concept. Large openings, free spans and installation space can affect the supporting structure. Early coordination makes it clear which choices require further research or elaboration before the design becomes final.

From explanation to your own project

View the associated structural calculation, create your preparation list or take the guides and checklists along to the consultation.

What are your construction plans?

Tell us what you want to change. Then we look at what calculation is needed.

Discuss your project
Call usRequest a quote