Indication of property · on request€3,630–€5,445 incl. VAT€3,000.00–€4,500.00 excl. VATWhat is assessed?
In a home, all structural components are designed together. The architectural plan forms the basis; the structural engineer further develops the supporting structure and stability.
Discuss early on how large expanses of glass, open floor plans, installations and material choices influence the structural design. This helps limit changes later in the process.
What data is needed?
The following information can be used to prepare the assessment. The structural engineer determines whether additional research is necessary.
- Architectural design
- Available soil survey
- Desired construction method and materials
- Principles for use and installations
What do you receive?
Record the exact delivery in the quotation. Depending on your project and assignment, this involves:
- Structural design within the assignment
- Calculations per agreed part
- Construction drawings and coordination with parties involved
Discuss who will take care of the architectural development, supplier details and any temporary support. In this way, the components involved are coordinated.
Materials and drawings
The choice of materials and connections follow from the design. Read more about Concrete and reinforcement and the difference between a architectural drawing and a construction drawing.
How does the process proceed?
You describe your project and share the available data. The assignment, any additional information and planning are then coordinated. Check it out complete step-by-step plan for all phases.
What does your assignment cover?
For a new house, clear responsibilities prevent gaps between the primary structure and supplier design. Agree who designs foundations, floors, roof and connections, and who coordinates them. Carry architectural changes through all affected structural documents.
Can I already order material?
Order structural parts based on the coordinated and current design data. A preliminary estimate is not a complete basis for this.
Is a site visit necessary?
That depends on the project and the available information. Sometimes drawings and photos are sufficient for the inventory; sometimes an admission or additional examination is necessary.
What happens if my plan changes?
Report changes before they are implemented. The structural engineer assesses whether calculations and drawings need to be adjusted.
From data to a detailed plan
Checklist for your application
| Given | What you prepare |
|---|---|
| Architectural design | Gather the most recent available data and identify what is missing. |
| Available soil survey | Gather the most recent available data and identify what is missing. |
| Desired construction method and materials | Gather the most recent available data and identify what is missing. |
| Principles for use and installations | Gather the most recent available data and identify what is missing. |
- Describe your complete construction plan.
A coherent structural design for foundation, floors, walls and roof.
- Discuss missing data.
The structural engineer determines which recording or additional information is required for the agreed assessment.
- Record order and delivery.
Agree on the calculated parts, drawings, price and planning.
- Match the effect to the implementation.
Use the current documents and have relevant changes reviewed before they are implemented.
Frequently asked questions about homes and new construction
What does a structural calculation for a new home include?
A related assignment can concern the foundation, floors, walls, columns, beams and roof. The precise parts and drawings must be agreed. Also ask which supplier calculations are required and who monitors mutual coordination.
When do I involve the structural engineer in new construction?
Preferably during the development of the main concept. Large openings, free spans and installation space can affect the supporting structure. Early coordination makes it clear which choices require further research or elaboration before the design becomes final.
Related constructive topics
Your project location
Provide the building address and share available drawings and photographs. Discuss whether a site survey is needed and which travel or investigation costs form part of the commission.
