For private individuals and contractors · Throughout the Netherlands 085 800 2901From first idea to constructive plan
Work area

Structural engineer in the province of Limburg

Structural calculations in Limburg: find your municipality, explore population and soil data, and prepare your load-bearing wall alteration, extension or foundations.

Follow the structure from roof to foundations

When altering a building in Limburg, assessing a new beam or column is part of reviewing the entire structural system. Loads must pass through existing floors and walls to the foundations. Look beyond the opening or extension on your sketch and include drawings of the storeys above and below. Municipal figures and the soil map provide local context; dimensions, material strength and ground conditions at the building address need individual assessment.

Limburg in figures
CharacteristicNumberReference date or period
Provincial population1,135,3281 January 2025
Municipalities312026 classification
Officially registered settlements1901 January 2026
Homes551,4891 January 2025
Newly built homes added2,7512025
All renovationsNot available in these sourcesNo estimate

CBS — population (1 January 2025) · CBS — housing stock and dwelling types (2025) · CBS — officially registered settlements (1 January 2026)

Soil and ground types

Within the boundaries of Limburg, map unit Hn21 covers the largest measured area of soil polygons in this analysis: 15,231 hectares, or 7.8% of the mapped area.

Original Dutch source name:

Veldpodzolgronden; leemarm en zwak lemig fijn zand

Soil map 2025 — intersection with the area boundary
Map codeDutch soil classification: first unitArea (ha)Share of mapped area
Hn21Veldpodzolgronden; leemarm en zwak lemig fijn zand15,2317.8%
zEZ23Hoge zwarte enkeerdgronden; lemig fijn zand13,8667.1%
Hn23Veldpodzolgronden; lemig fijn zand11,5025.9%
BLd6Radebrikgronden; siltige leem10,2355.3%
BLb6Bergbrikgronden; siltige leem9,5704.9%
Other unitsOther mapped soil polygons133,69568.9%

The shares are calculated within the soil polygons on the map, not across all land or all building addresses. For compound map codes, the name of the first unit is shown. The map describes shallow soil; built-up areas are not fully mapped. It does not establish bearing capacity or determine whether piles, pad footings or strip foundations should be used.

Explore subsurface data in BROloket · How the soil map can be used · Method and sources for these area profiles

Read about foundation investigations · Pad footing, pile or strip foundation?

How much renovation takes place?

The CBS tables used here do not provide a complete local renovation count for Limburg. We therefore do not estimate this from population, new homes or a national percentage. These sources also do not establish which type of renovation is most common.

See the available building figures and what they mean

Municipalities and settlements

31 municipalities

Municipalities, settlements and structural engineering services
Municipality and settlementsProvinceMunicipal population (2025)Your building project
Beek
3 settlements
Limburg16,251Choose the appropriate calculation
Beekdaelen
14 settlements
Limburg35,824Choose the appropriate calculation
Beesel
2 settlements
Limburg13,524Choose the appropriate calculation
Bergen (L)
5 settlements
Limburg13,062Choose the appropriate calculation
Brunssum
1 settlements
Limburg27,534Choose the appropriate calculation
Echt-Susteren
7 settlements
Limburg32,269Choose the appropriate calculation
Eijsden-Margraten
11 settlements
Limburg26,181Choose the appropriate calculation
Gennep
5 settlements
Limburg17,785Choose the appropriate calculation
Gulpen-Wittem
12 settlements
Limburg14,017Choose the appropriate calculation
Heerlen
2 settlements
Limburg87,522Choose the appropriate calculation
Horst aan de Maas
16 settlements
Limburg44,242Choose the appropriate calculation
Kerkrade
2 settlements
Limburg45,490Choose the appropriate calculation
Landgraaf
1 settlements
Limburg36,839Choose the appropriate calculation
Leudal
16 settlements
Limburg36,108Choose the appropriate calculation
Maasgouw
8 settlements
Limburg24,502Choose the appropriate calculation
Maastricht
1 settlements
Limburg125,563Choose the appropriate calculation
Meerssen
5 settlements
Limburg18,460Choose the appropriate calculation
Mook en Middelaar
4 settlements
Limburg8,102Choose the appropriate calculation
Nederweert
4 settlements
Limburg17,512Choose the appropriate calculation
Peel en Maas
10 settlements
Limburg45,881Choose the appropriate calculation
Roerdalen
6 settlements
Limburg20,836Choose the appropriate calculation
Roermond
3 settlements
Limburg61,210Choose the appropriate calculation
Simpelveld
3 settlements
Limburg10,270Choose the appropriate calculation
Sittard-Geleen
13 settlements
Limburg92,491Choose the appropriate calculation
Stein
3 settlements
Limburg24,653Choose the appropriate calculation
Vaals
3 settlements
Limburg10,007Choose the appropriate calculation
Valkenburg aan de Geul
4 settlements
Limburg16,464Choose the appropriate calculation
Venlo
7 settlements
Limburg103,984Choose the appropriate calculation
Venray
14 settlements
Limburg44,807Choose the appropriate calculation
Voerendaal
3 settlements
Limburg12,583Choose the appropriate calculation
Weert
2 settlements
Limburg51,355Choose the appropriate calculation

What are your construction plans?

Tell us what you want to change. Then we look at what calculation is needed.

Discuss your project
Call usRequest a quote