Structural calculationPrice on requestWhat is assessed?
The design of a shed depends on the construction method, dimensions and use. A light garden shed has different principles than a workspace with heavy storage.
Provide advance notice of machinery, attic storage, and future roof installations. This means that the assessment is based on actual use.
What data is needed?
The following information can be used to prepare the assessment. The structural engineer determines whether additional research is necessary.
- Dimensions and construction method
- Intended use and storage
- Roof and floor build-up
- Substrate
What do you receive?
Record the exact delivery in the quotation. Depending on your project and assignment, this involves:
- Calculation of the agreed components
- Stability principles
- Connection and foundation details
Discuss who will take care of the architectural development, supplier details and any temporary support. In this way, the components involved are coordinated.
Materials and drawings
The choice of materials and connections follow from the design. Read more about Structural timber and the difference between a architectural drawing and a construction drawing.
How does the process proceed?
You describe your project and share the available data. The assignment, any additional information and planning are then coordinated. Check it out complete step-by-step plan for all phases.
What does your assignment cover?
Describe what the shed will hold: light garden equipment, machinery and loft storage require different assumptions. Also state whether it will be heated or used differently later. Intended use helps define the floor and structural assessment.
Can I already order material?
Order structural parts based on the coordinated and current design data. A preliminary estimate is not a complete basis for this.
Is a site visit necessary?
That depends on the project and the available information. Sometimes drawings and photos are sufficient for the inventory; sometimes an admission or additional examination is necessary.
What happens if my plan changes?
Report changes before they are implemented. The structural engineer assesses whether calculations and drawings need to be adjusted.
From data to a detailed plan
Checklist for your application
| Given | What you prepare |
|---|---|
| Dimensions and construction method | Gather the most recent available data and identify what is missing. |
| Intended use and storage | Gather the most recent available data and identify what is missing. |
| Roof and floor build-up | Gather the most recent available data and identify what is missing. |
| Substrate | Gather the most recent available data and identify what is missing. |
- Describe your complete construction plan.
From wooden shed to masonry outbuilding: start with the use and load.
- Discuss missing data.
The structural engineer determines which site survey or additional information is required for the agreed assessment.
- Record order and delivery.
Agree on the calculated parts, drawings, price and planning.
- Coordinate the design with the construction work.
Use the current documents and have relevant changes reviewed before they are implemented.
Frequently asked questions about shed
What information determines the calculation of a shed?
In addition to dimensions and construction method, use, roof structure, support and subsurface are relevant. Machines, a storage attic or heavy installations must be mentioned separately. This way, the assignment is in line with real use.
Has the construction of a kit already been completely calculated?
Check which parts the supplier develops and for what circumstances. Foundations, anchoring or specific adjustments may fall outside the standard package. Record who assesses missing parts.
Related structural topics
Your project location
Provide the building address and share available drawings and photographs. Discuss whether a site survey is needed and which travel or investigation costs form part of the commission.