What documents do you keep during construction?

A clear file helps with coordination, delivery and later changes.

The short answer

A clear file helps with coordination, delivery and later changes.

Construction drawings, measuring tools and laptop on a work table

Organize by subject and revision

Separate design pieces, implementation drawings, correspondence and product data. Use recognizable names with dates or revision and make visible which set is current.

Link photos to parts

A photo is more useful later if the location, date and part are known. Discuss with the contractor which connections or hidden parts are relevant to record.

Capture what is no longer visible later

Supports, connections and penetrations can be difficult to reach after finishing. Agree in advance which information will be kept and who will do so. Use photos with a recognizable location and date and link them to the current drawing. This gives the file context. A large number of individual photos without explanation do not make it clear which part or which revision has been recorded.

Demonstrably close open points

Make an overview of questions, deviations and agreed actions during work. Note for each point who is responsible and when the outcome is needed. Keep the final decision with the relevant documents. Check with delivery which points are still open and which document adjustments are missing. An orderly file helps to understand the situation later and prevents ambiguity about provisional agreements.

Your preparation in four steps

  1. Current calculations and drawings
  2. Committed changes
  3. Product and delivery details
  4. Photos with context

Frequently asked questions on this topic

What does a structural calculation for a new home include?

A related assignment can concern the foundation, floors, walls, columns, beams and roof. The precise parts and drawings must be agreed. Also ask which supplier calculations are required and who monitors mutual coordination.

When do I involve the structural engineer in new construction?

Preferably during the development of the main concept. Large openings, free spans and installation space can affect the supporting structure. Early coordination makes it clear which choices require further research or elaboration before the design becomes final.

From explanation to your own project

View the associated structural calculation, create your preparation list or take the guides and checklists along to the consultation.

What are your construction plans?

Tell us what you want to change. Then we look at what calculation is needed.

Discuss your project
Call usRequest a quote